Calibration Charts Case = STA2 ,  Cell  =  C3 05/31/05
STA2 Cells in parallel        
Simulation Period 03/01/01 03/24/05 Inflows  = S6 + G328 + Estimated Seepage to Inflow Canal
Output Period: 03/01/01 03/24/05              
Calibration Period: 05/01/03 03/24/05              
Predicted Values for Calibration Period Calibration Set: SAV_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 87 cm K 52.5 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 5.0 cm/d C1 22 ppb Count 24 24 24 23 23 23
Mean P Load 1778 mg/m2-yr C2 300 ppb Observed 80.1 4.9 0.72 14.9 14.6 15.6 0.98
Mean Flow/Width 284 m2/day Z1 40 cm Predicted 87.3 4.8 0.87 18.0 11.2 9.9 0.63
Hydraulic Resid Time 18 days Z2 100 cm Mean Resid -7.3 0.0 -0.14 -3.1 3.3 5.7 0.35
Inflow Conc 98 ppb Z3 400 cm Bias % -8% 1% -17% -17% 30% 58% 57%
FWM Outflow Conc 18 ppb Avg Int 30 days Residual SE% 28% 24% 21% 158% 59% 59%
GeoMn Outflow Conc 11 ppb Area 9.1911 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed