Calibration Charts Case = STA1W_C4T ,  Cell  =  C4 05/31/05
STA1W - Cell 4          
Simulation Period 08/01/94 03/31/05 Inflow = G254          
Output Period: 08/01/94 03/31/05 Outflow = G309+G256        
Calibration Period: 07/01/00 08/31/04              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 64 cm K 74.4 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 17.5 cm/d C1 22 ppb Count 51 51 51 51 51 51
Mean P Load 7328 mg/m2-yr C2 300 ppb Observed 66.4 17.2 9.79 56.9 37.1 35.9 0.65
Mean Flow/Width 298 m2/day Z1 40 cm Predicted 63.7 16.9 10.10 59.6 39.6 37.7 0.66
Hydraulic Resid Time 4 days Z2 0 cm Mean Resid 2.8 0.3 -0.31 -2.7 -2.4 -1.9 -0.01
Inflow Conc 114 ppb Z3 0 cm Bias % 4% 2% -3% -5% -6% -5% -2%
FWM Outflow Conc 60 ppb Avg Int 30 days Residual SE% 24% 16% 16% 196% 38% 38%
GeoMn Outflow Conc 40 ppb Area 1.45 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed