Calibration Charts Case = STA1W_C4 ,  Cell  =  C4 05/31/05
STA1W - Cell 4          
Simulation Period 08/01/94 03/31/05 Inflow = G254 - G309        
Output Period: 01/01/00 03/31/05 Outflow = G256          
Calibration Period: 07/01/00 08/31/04              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 62 cm K 57.7 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 9.5 cm/d C1 22 ppb Count 51 51 51 49 49 49
Mean P Load 3485 mg/m2-yr C2 300 ppb Observed 66.4 9.0 3.38 37.5 32.0 32.2 0.85
Mean Flow/Width 162 m2/day Z1 40 cm Predicted 62.1 8.9 3.35 37.5 33.4 32.4 0.89
Hydraulic Resid Time 7 days Z2 0 cm Mean Resid 4.4 0.1 0.03 0.0 -1.4 -0.2 -0.04
Inflow Conc 100 ppb Z3 0 cm Bias % 7% 1% 1% 0% -4% 0% -4%
FWM Outflow Conc 38 ppb Avg Int 30 days Residual SE% 21% 26% 26% 177% 45% 45%
GeoMn Outflow Conc 33 ppb Area 1.45 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed