Calibration Charts Case = STA1W_C3 ,  Cell  =  C3 05/31/05
STA1W - Cell 3          
Simulation Period 08/01/94 03/31/05 Measured Outflows = G251-G256+G308    
Output Period: 01/01/00 03/31/05              
Calibration Period: 07/01/00 08/31/04              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 48 cm K 6.4 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 6.7 cm/d C1 22 ppb Count 51 51 51 47 47 47
Mean P Load 1413 mg/m2-yr C2 300 ppb Observed 46.2 4.9 2.00 40.3 32.9 31.7 0.82
Mean Flow/Width 206 m2/day Z1 40 cm Predicted 48.5 6.2 2.59 41.6 37.1 33.1 0.89
Hydraulic Resid Time 7 days Z2 0 cm Mean Resid -2.3 -1.3 -0.59 -1.3 -4.2 -1.4 -0.08
Inflow Conc 58 ppb Z3 0 cm Bias % -5% -20% -23% -3% -11% -4% -9%
FWM Outflow Conc 42 ppb Avg Int 30 days Residual SE% 26% 45% 45% 119% 31% 31%
GeoMn Outflow Conc 37 ppb Area 4.15 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed