Calibration Charts Case = STA1W_All ,  Cell  =  ALL 05/31/05
STA1W  - Full Operation - All Cells Combined  
Simulation Period 08/01/94 03/31/05 Seepage Recycle Ignored        
Output Period: 01/01/00 03/31/05              
Calibration Period: 06/01/01 08/31/04              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 58 cm K 34.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 5.0 cm/d C1 22 ppb Count 40 40 40 38 38 38
Mean P Load 2996 mg/m2-yr C2 300 ppb Observed 65.6 5.0 2.33 46.9 40.7 39.3 0.87
Mean Flow/Width 273 m2/day Z1 40 cm Predicted 58.0 4.4 1.97 45.0 39.4 36.5 0.87
Hydraulic Resid Time 12 days Z2 0 cm Mean Resid 7.6 0.6 0.35 1.9 1.3 2.8 -0.01
Inflow Conc 165 ppb Z3 0 cm Bias % 13% 13% 18% 4% 3% 8% -1%
FWM Outflow Conc 45 ppb Avg Int 30 days Residual SE% 26% 24% 24% 59% 32% 32%
GeoMn Outflow Conc 39 ppb Area 27 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed