Calibration Charts Case = PSTA_FS1W ,  Cell  =  C1 05/31/05
PSTA Field Scale Cell 1        
Simulation Period 09/06/00 04/03/03 Limerock          
Output Period: 07/01/01 04/03/03              
Calibration Period: 08/01/02 04/03/03              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 40 cm K 11.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 13.3 cm/d C1 22 ppb Count 35 36 36 35 35 35
Mean P Load 1278 mg/m2-yr C2 300 ppb Observed 38.1 6.4 1.18 18.4 17.3 17.5 0.94
Mean Flow/Width 39 m2/day Z1 0 cm Predicted 40.3 6.2 1.08 17.5 16.7 16.3 0.95
Hydraulic Resid Time 3 days Z2 0 cm Mean Resid -2.1 0.3 0.10 0.9 0.6 1.2 -0.01
Inflow Conc 26 ppb Z3 0 cm Bias % -5% 4% 10% 5% 4% 7% -1%
FWM Outflow Conc 17 ppb Avg Int 7 days Residual SE% 17% 24% 15% 52% 32% 32%
GeoMn Outflow Conc 17 ppb Area 0.0194 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed