Calibration Charts Case = OKEE_8794 ,  Cell  =  - 05/31/05
observed concentrations in open lake    
Simulation Period 01/01/81 12/31/97              
Output Period: 01/01/84 12/31/97              
Calibration Period: 01/01/87 12/31/94              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 261 cm K 3.5 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 0.4 cm/d C1 150 ppb Count 0 33 33 33 33 33
Mean P Load 212 mg/m2-yr C2 0 ppb Observed #N/A 0.2 0.23 101.1 96.0 91.5 0.95
Mean Flow/Width 152 m2/day Z1 40 cm Predicted #N/A 0.2 0.22 94.0 95.0 95.0 1.01
Hydraulic Resid Time 714 days Z2 100 cm Mean Resid #N/A 0.0 0.01 7.1 1.0 -3.5 -0.06
Inflow Conc 159 ppb Z3 350 cm Bias % #N/A -4% 4% 8% 1% -4% -6%
FWM Outflow Conc 94 ppb Avg Int 90 days Residual SE% #N/A 61% 61% 109% 22% 22%
GeoMn Outflow Conc 95 ppb Area 1732 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed