Calibration Charts Case = OKEE_7578 ,  Cell  =  - 05/31/05
observed concentrations in open lake    
Simulation Period 11/01/72 12/31/81 simulation possibly affected by initial condition  
Output Period: 01/01/73 12/31/81              
Calibration Period: 01/01/75 12/31/78              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 255 cm K 8.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 0.4 cm/d C1 150 ppb Count 0 17 17 17 17 17
Mean P Load 249 mg/m2-yr C2 0 ppb Observed #N/A 0.2 0.13 63.4 58.2 56.5 0.92
Mean Flow/Width 157 m2/day Z1 40 cm Predicted #N/A 0.2 0.12 60.1 58.7 58.1 0.98
Hydraulic Resid Time 674 days Z2 100 cm Mean Resid #N/A 0.0 0.01 3.3 -0.5 -1.6 -0.06
Inflow Conc 180 ppb Z3 350 cm Bias % #N/A 0% 6% 6% -1% -3% -6%
FWM Outflow Conc 60 ppb Avg Int 90 days Residual SE% #N/A 76% 76% 129% 36% 36%
GeoMn Outflow Conc 59 ppb Area 1732 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed