Calibration Charts Case = ISTOKPOGA ,  Cell  =  - 05/31/05
data from Havens & Walker (2003)      
Simulation Period 01/01/88 09/30/00              
Output Period: 01/01/88 09/30/00              
Calibration Period: 10/01/93 09/30/00              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 159 cm K 6.1 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 0.9 cm/d C1 150 ppb Count 29 29 29 28 28 28
Mean P Load 364 mg/m2-yr C2 0 ppb Observed 166.6 0.9 0.45 50.3 39.3 38.3 0.78
Mean Flow/Width 96 m2/day Z1 40 cm Predicted 158.9 0.9 0.40 45.9 39.8 39.4 0.87
Hydraulic Resid Time 170 days Z2 100 cm Mean Resid 7.7 0.0 0.04 4.5 -0.5 -1.1 -0.09
Inflow Conc 107 ppb Z3 350 cm Bias % 5% 1% 10% 10% -1% -3% -10%
FWM Outflow Conc 46 ppb Avg Int 90 days Residual SE% 10% 36% 36% 183% 44% 44%
GeoMn Outflow Conc 40 ppb Area 110 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed