Calibration Charts Case = HARNEY ,  Cell  =  - 05/31/05
compiled by burns & mcdonnell      
Simulation Period 10/01/90 08/31/03              
Output Period: 10/01/90 08/31/03              
Calibration Period: 10/01/91 08/31/03              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 288 cm K 1.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 17.6 cm/d C1 150 ppb Count 135 146 146 146 146 146
Mean P Load 5024 mg/m2-yr C2 0 ppb Observed 279.7 17.6 14.91 84.9 78.1 78.0 0.92
Mean Flow/Width 1135 m2/day Z1 40 cm Predicted 287.6 17.6 13.66 77.4 74.5 74.3 0.96
Hydraulic Resid Time 16 days Z2 100 cm Mean Resid -7.9 -0.1 1.25 7.5 3.6 3.7 -0.04
Inflow Conc 78 ppb Z3 350 cm Bias % -3% 0% 9% 10% 5% 5% -4%
FWM Outflow Conc 77 ppb Avg Int 30 days Residual SE% 6% 4% 4% 35% 22% 22%
GeoMn Outflow Conc 74 ppb Area 29.93 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed