Calibration Charts Case = ENRP_C4 ,  Cell  =  C4 05/31/05
ENRP - Cell 4          
Simulation Period 08/01/94 12/31/98 Prior to STA1W Construction      
Output Period: 08/01/94 12/31/98              
Calibration Period: 01/01/97 12/31/98              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 66 cm K 63.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 12.7 cm/d C1 22 ppb Count 25 25 25 25 25 25
Mean P Load 1649 mg/m2-yr C2 300 ppb Observed 62.8 11.2 1.92 17.2 16.6 16.4 0.97
Mean Flow/Width 216 m2/day Z1 40 cm Predicted 65.6 12.2 2.05 16.8 16.5 16.1 0.98
Hydraulic Resid Time 5 days Z2 0 cm Mean Resid -2.8 -1.0 -0.14 0.4 0.1 0.4 -0.01
Inflow Conc 36 ppb Z3 0 cm Bias % -4% -9% -7% 2% 1% 2% -1%
FWM Outflow Conc 17 ppb Avg Int 30 days Residual SE% 12% 16% 16% 31% 26% 26%
GeoMn Outflow Conc 16 ppb Area 1.45 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed