Calibration Charts Case = ENRP_C1 ,  Cell  =  C1 05/31/05
ENRP Cell 1 + Buffer Cell combined    
Simulation Period 08/01/94 12/31/98 Seepage return treated as external inflow    
Output Period: 08/01/94 12/31/98 Prior to STA1W construction      
Calibration Period: 01/01/97 12/31/98              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 49 cm K 16.8 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 2.9 cm/d C1 22 ppb Count 25 25 25 25 25 25
Mean P Load 946 mg/m2-yr C2 300 ppb Observed 49.9 1.9 0.72 38.7 39.5 39.6 1.02
Mean Flow/Width 117 m2/day Z1 40 cm Predicted 49.3 2.6 1.04 40.5 38.9 38.1 0.96
Hydraulic Resid Time 17 days Z2 0 cm Mean Resid 0.7 -0.7 -0.32 -1.9 0.5 1.6 0.06
Inflow Conc 89 ppb Z3 0 cm Bias % 1% -27% -31% -5% 1% 4% 6%
FWM Outflow Conc 41 ppb Avg Int 30 days Residual SE% 10% 42% 42% 51% 38% 38%
GeoMn Outflow Conc 39 ppb Area 6.03 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed