Calibration Charts Case = ENRP_ALL ,  Cell  =  C1234 05/31/05
Lumped simulation of ENRP      
Simulation Period 08/01/94 12/31/98 Inflows include measured seepage return to cell 1  
Output Period: 08/01/94 12/31/98              
Calibration Period: 01/01/97 12/31/98              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 52 cm K 23.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 2.5 cm/d C1 22 ppb Count 25 25 25 25 25 25
Mean P Load 752 mg/m2-yr C2 300 ppb Observed 51.9 1.8 0.37 20.0 19.1 19.2 0.95
Mean Flow/Width 147 m2/day Z1 40 cm Predicted 52.4 2.1 0.41 19.6 19.2 18.8 0.98
Hydraulic Resid Time 21 days Z2 0 cm Mean Resid -0.5 -0.2 -0.04 0.4 -0.1 0.4 -0.02
Inflow Conc 84 ppb Z3 0 cm Bias % -1% -11% -10% 2% -1% 2% -2%
FWM Outflow Conc 20 ppb Avg Int 30 days Residual SE% 9% 23% 23% 31% 21% 21%
GeoMn Outflow Conc 19 ppb Area 15.45 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed