Calibration Charts Case = C111_WEST ,  Cell  =  Marsh 05/31/05
C111 - Periphyton Area - West Transect - Inflows from E1/W1
Simulation Period 01/01/95 12/31/00              
Output Period: 01/01/97 12/31/00              
Calibration Period: 08/01/98 12/31/00              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 13 cm K 21.1 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 37% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 5.3 cm/d C1 22 ppb Count 17 24 24 24 24 24
Mean P Load 142 mg/m2-yr C2 300 ppb Observed 12.5 6.6 0.39 5.9 5.3 5.0 0.91
Mean Flow/Width 121 m2/day Z1 0 cm Predicted 12.0 6.4 0.42 6.6 5.6 5.2 0.85
Hydraulic Resid Time 2 days Z2 0 cm Mean Resid 0.6 0.3 -0.03 -0.7 -0.2 -0.2 0.06
Inflow Conc 7 ppb Z3 0 cm Bias % 5% 4% -7% -11% -4% -4% 7%
FWM Outflow Conc 7 ppb Avg Int 30 days Residual SE% 36% #N/A 13% 39% 37% 37%
GeoMn Outflow Conc 6 ppb Area 14.168 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed